Twin Lakes New College Building
2701 Cabrillo College Dr. Aptos, CA 95003
Client: Twin Lakes Baptist Church, 2701 Cabrillo College Dr. Aptos, CA 95003
Category: Education
Date: November 2019
Price:
Scope: Structural Steel and Miscellaneous Metals.
Services: Structural engineering, BIM services, Project Management Steel Detailing, Steel Fabrication, Steel Erection.
Genral Contractor: Bogard Construction, Inc. 350-A Coral St. Santa Cruz, CA 95060
Architect: Mayfield Architects 20 Plaza, Mt Hermon, CA 95041